"If it's really urgent, it's not impossible to speed up the process.
Moreover, if we focus all efforts on repairing one location, we can indeed speed things up.
This part, I believe, can be completed in less than half a month.
After all, the current speed is quite impressive, although finishing it within half a month means the external structure, or the appearance, may not be very satisfactory.
Remember, the intricate work like fine detailing is still to come, whether it's the exterior walls or the interiors, they all depend on the later stages."
After pondering for a while, Lao Lin reached this conclusion, and Lin Yi was quite pleased to hear this.
Because it was indeed as Lao Lin said, the troublesome work was all in the later stages.
The construction itself is the simplest part, but to make the community appealing later, meticulous detailing is essential. For instance, the detailed carving of the pavilions on the rooftops requires slowing down the pace.
