June 10th, 2025 — One Week Later.
In the TG Motors Headquarters, inside the executive room. Timothy was handling paperworks, signing and stamping documents left and right and then stacking them.
While doing so, Hana stood near the presentation screen, holding a tablet and a neatly bound folder marked Aurion Foundry — Proposal Sites.
"Sir," Hana began, "the proposal for the Aurion Foundry sites is ready. San Miguel Corporation submitted three locations for consideration, all vetted by the joint assessment team with NVIDIA's engineering consultants."
She tapped the screen, and a detailed map appeared—three red markers highlighting Batangas, Clark, and Cebu.
"The Batangas site offers direct access to industrial ports and power grid stability. Clark provides air freight efficiency, but limited water resources. Cebu, on the other hand, has favorable tax policies and available manpower, though logistical costs are slightly higher."
Timothy nodded slowly. "And NVIDIA's preference?"
