June 16th, 2025.
The following day.
The rain had stopped just before noon, leaving the streets of Bonifacio Global City slick with reflections of glass towers and crossing headlights. Inside the TG Motors Headquarters, the atmosphere was calm but heavy with anticipation. Everyone knew that today was historic, the formal signing of the TG Tower construction contract.
The conference room, normally bright with activity, had been rearranged for the event. A polished mahogany table stood in the center, its surface gleaming under the soft lights. At the far end, two folders embossed with silver lettering rested on a leather mat. The documents inside represented the largest infrastructure investment in TG Motors' history.
