They patiently thread rolls of NM-B armored cables of different colors that meet North American electrical standards through the conduits previously embedded in the log walls, and run them through the holes of the newly assembled light steel Dragon Bone framework.
They carefully guide the wiring out to each reserved location for switches, sockets, and light fixtures, leaving enough length, and place them into blue PVC junction boxes pre-fixed on the Dragon Bone.
"Look."
Cody pointed to a reserved switch box and said, "All wiring must be laid in place before the panel is sealed; once the gypsum board is up, making changes will be very troublesome."
"Moreover, all connections must be completed within the junction boxes, which is the basic safety standard."
The same goes for the hot and cold water PEX pipes connecting the kitchen, two bathrooms, and laundry room.
