Inside the workshop's core control room, a holographic projection divided the entire strategic zone into a dozen or so sectors. The once sparse map was now covered in glowing dots representing friendly units.
[Report, Commander. As of today, the quarterly report for Zone 18 has been compiled.]
Allen sat in the comfortable chair custom-made for him, watching as the projection before him switched to a familiar financial statement.
[New mineral veins discovered and put into production this quarter: one new medium-sized black-striped iron mine and one rich fire-element crystal cluster mine. Total controlled mining sites: 7.]
[Production Statistics: Total ore extraction this quarter increased by 157%. Equivalent monthly net profit: 645,000 Low-Level Magic Stones. Monthly equipment and Golem maintenance expenditure: approximately 75,000 Magic Stones.]
[Current actual controlled area of the zone: 34,650 square kilometers.]
