A gust of wind blew across the position, lifting a sky full of dust and sand.
The position, which had been blown to pieces by thirteen consecutive strong attacks, had been repaired during a few hours of ceasefire.
Ranks of brand-new bulletproof walls were embedded into the soil by Engineering Mecha, filled with soil fortifying agents. The explosion-proof shed and concealed holes in the trenches were reinforced again. The energy shields for the shooting positions, heavy firepower positions, ammunition storage holes, and position electronic interference devices were all repaired and replaced. The traffic trenches extending backward and the reserve force assembly zone became more orderly and spacious under the efforts of the Engineering Camp.
At this moment, the soldiers at Position 152 were each in their place, fully prepared for battle.
